RETROSTRESS
Menu
← All articles

Automation

How to schedule repeat load tests

Compare system changes with scheduled, authorized load testing. Establish a baseline, agree on timing, and review each run.

Establish a baseline

Review a manual run first. Scheduling a test is most useful when the configuration already has a clear purpose.

Coordinate the schedule

Pick a suitable time and tell the responsible team. Check that authorization still covers the target and timing.

Keep schedules current

Remove obsolete jobs, review the results, and revisit settings when the system changes.

Read the getting-started guide