Automation
How to schedule repeat load tests
Compare system changes with scheduled, authorized load testing. Establish a baseline, agree on timing, and review each run.
Establish a baseline
Review a manual run first. Scheduling a test is most useful when the configuration already has a clear purpose.
Coordinate the schedule
Pick a suitable time and tell the responsible team. Check that authorization still covers the target and timing.
Keep schedules current
Remove obsolete jobs, review the results, and revisit settings when the system changes.